WORK PROGRESS AT PENTHOUSE DE GIRARDA – JANUARY 2022 (VIDEO)
Stairs! The first stairs connecting the floors of the apartments have appeared. According to the plan, the company that makes the steel structures of the stairs has started the assembly.
The recordings and the condition visible on the recording and photos show the actual condition of the investment as of January 31, 2022.
Water meters and water installation were also installed. The apartments also include Geberit flush-mounted WC frames. Walls and board joints are smoothed before applying the plaster. You can also see on the video solid electrical cables that are distributed over the property. You can find all the details of the standard of interior finishing in the developer state HERE.
The penthouse on the real estate market and the standard of finish are distinguished by the terrace, which is mandatory if we want to call the apartment a penthouse. In the penthouses we offer, each one has a panoramic terrace overlooking the panorama of the area. The next stage of work will be the placement of granite slabs on the terrace, which can already be seen in the photo below.
We invite you to the presentation of Penthouse de Girard by appointment. Our Sales Office is located in the same building, in the building of the New Linen Spinning Plant in Żyrardów, at Hiellego 3/211 Street (“Przędzalnia” on the second floor). Detailed information in the contact tab.
We will be happy to tell you about the investment and have a coffee together in the restored loft.
See you soon!
The team of Penthouse de Girarda Sp. z o.o.